Perimeter angle of 25mm x 25mm is set on all sides of the ceiling giving a base for gypsum board ceiling or as manufacturer instruction.
Gypsum board ceiling installation method statement.
The general rule for hanging ceiling drywall is to install the largest panels you can handle.
Below is given safe work method of statement for the installation of gypsum board ceiling work in simple steps which can be followed for easy understanding and sequencing the works.
Method statement for drywall work 1 general requirements 1 1 the installer shall supply and install the gypsum calcium silicate board in accordance with specification as shown on the drawings.
Masuzi june 13 2018 uncategorized leave a comment 77 views.
This method statement provides the control sequence of construction and methodology that will be used for the installation of dry wall with resilient material as an acoustic treatment for walls inside the area of treatment by m s optima international.
Technical data test certificates installation instructions and valid.
Installation of gypsum board construction methodology gypsum board method statement for installation of mf false ceiling works gypsum board.
The main runner or the c channel is spaced at 1200mm on center holding the framed furring channel to which the gypsum ceiling board is fixed at right angle or as manufacturer instruction.
O submitted technical submittal for acoustic treatment.
This also outlines the health and safety hazards involved and include the guide on how to do the process safely.
This method statement for false ceiling describes the details of the installation of suspended gypsum board and tile ceiling with the use of metal framings in the project.
Gypsum board ceiling installation method statement.
Civil method statements tags.
This procedure is applicable to the following works associated with.
Site construction methodology gypsum board installation to ceiling steel framing installation actual site photos installation fixing and suspension component gypsum board installed to furring.
The long sides of the panels.
Submission documents 2 1 technical data.
To ensure that the gypsum board suspended ceiling and related activities are executed safely and in accordance with the contract requirements and that all quality assurance control activities are conducted in a systematic manner to ensure that works are inspected conformance is verified and documented.
Obtain necessary clearances and approvals from engineers including mep clearance.