Input length width and depth of the area.
How to figure volume for a sloped concrete wall.
Use our concrete slabs calculator or estimator as a guide for how much concrete mix you need for your project.
To find the area of the face of the wall i drew a horizontal line across the wall to divide the face into a rectangle and a triangle.
Calculation of volume of concrete for the column.
Calculate volume of square slab calculator use.
This calculator is to be used as an estimating tool only.
Calculating wall studs drywall ready mix tape joint compound nails screws.
Calculate the volume in cubic feet l x w x d of the area for which you need fill material.
The amount given as needed does not include any waste.
A 1 2 1 slope means the excavation must be sloped 1 2 unit for each 1 unit of depth.
All concrete is estimated in cubic yards one cubic yard 27 cubic feet.
Calculate volumes for concrete slabs walls footers columns steps curbs and gutters.
Enter dimensions in us units inches or feet or metric units centimeters or meters of your concrete structure to get the cubic yards value of the amount of concrete you will need to make this structure.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
After you pick the material you will need to figure out exactly how much of it you will need for your concrete project.
Concrete is ordered by volume in cubic yards.
The volume of concrete area of rectangle x depth.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
The volume of concrete needed is the area of the face of the wall times its thickness of 12 inches.
The calculator will automatically estimate the number of cubic yards of concrete that will be required.
This concrete calculator will help you in estimating the amount of concrete needed for your project.
For a 10 depth the slope will extend within 5 of the edge of the excavation.
Please enter length in foot.
To use the concrete wall calculator simply enter the width length and thickness of your pour.
One tank in the diked area note that the length width and height of the dike must be measured on the inside not the outside of the dike.
1 measure the length of the dike wall in feet a in the formula.
Input length and width of the area.
For large concrete jobs four cubic yards or more the concrete should be delivered by a ready mix truck.
Here is my sketch of your wall not to scale.
It is recommended depending on the job you are doing to add anywhere from an extra 4 to 10 to your concrete order to make sure you have enough concrete to finish the job.